Scarlett Grace goes to London
Posted on 9th June 2017 at 11:17
Many maintenance and facilities companies come up against obstacles which they have to overcome in order to do their work safely and efficiently. High Reaching Solutions were approached by one such company, Aegis Fire & Security. They had a multitude of obstacles to overcome which included working from a mezzanine walkway as the floor was crammed with machinery, fenced of exclusion zones, electrical conduits, pipework, storage tanks etc. Basically the floor area was totally covered except for marked pedestrian walkways, hence the installed mezzanine walkway.
Aegis Fire & Security needed to work at height safely and work from the mezzanine walkway as mentioned to install their fire and security system. This created another problem as parts of the walkway were very narrow and this combined with a weight limit meant there were very few options. Scaffolding the work area from the floor had been looked at, but the complexity, scale, time constraints, high possibility of damage to machinery and equipment during the build and disassembly and the very high cost meant this really wasn’t an option. They had contact a few very well-known companies within the access industry before being recommended to us by one of them, Promax Access.